Design - Build

Bonner Bridge (B-2500)
Ahoskie Bridge (B-5018)
Wilmington Bypass (R-2633)

Primary Services:

  • Pursuit consultation
  • 404/401/CAMA/Buffer permitting
  • Permit compliance

Why CEI:

  • Design-Build experience since 2001
  • Proven success acquiring permits on time
  • First NC DB permit (R-2641)
  • First NC DB IP/CAMA permit (R-2404A)
  • Bonner Bridge Peer Review